IIBM – Can you risk sending out a design to a supplier when the design is to be proved


Can you risk sending out a design to a supplier when the design is to be proved

Can you risk sending out a design to a supplier when the design is to be proved

IIBM MBA CASE LET ANSWER SHEETS,

MBA IIBM ANSWER SHEETS,

IIBM EMBA CASE LET ANSWER SHEETS,

EMBA IIBM ANSWER SHEETS,

IIBM MIB ANSWER SHEETS,

MIB IIBM CASE STUDY ANSWER SHEETS,

DMS IIBM ANSWER SHEETS,

IIBM DMS CASE STUDY SOLUTIONS PAPERS,

IIBM CASE STUDY ANSWER SHEETS,

IIBM MULTIPLE ANSWERS.

 

Assignment Solutions, Case study Answer sheets

Project Report and Thesis contact

aravind.banakar@gmail.com

www.mbacasestudyanswers.com

ARAVIND – 09901366442 – 09902787224

 

 

Project Management in Construction

Q1. It included Manpower, material and machinery that is necessary to perform the work:

  1. Scope

  2. Quality

  3. Resources

  4. Completion time

Q2. In this analysis a project is formulated and appraised based on the estimates generated from past data, experience & analysis.

  1. Risk analysis

  2. Sensitivity analysis

  3. Probability analysis

  4. Economic analysis

Q3. It is a verbal written or on-line document that shows the up-to-date performance status of a task that has been entrusted to a responsibility/accounting centre.

  1. Trends Forecasting

  2. Reporting Performance

  3. Performance Variance Analysis

  4. Recording Performance

Q4. In this contract, the architectural and engineering design and drawings are  provided by the Employer/Client to the contractor at the time of tendering as a part of the contract documents:

  1. Build-only contracts

  2. Build-own transfer contracts

  3. Engineering Procurement

  4. Construction Contract

Q5. These arise where no ground exists either in the contract or in common law:

  1. Contractual claims

  2. Extra contractual claims

  3. Ex-gratia claims

  4. None of the above

Q6. In this case, both the parties willingly discuss the dispute and arrive at a settlement without the intervention of any third party:

  1. Conciliation through negotiations

  2. Conciliation through mediation

  3. Conciliation by setting up Dispute Review Board (DRB)

  4. Conciliation through others

Q7. The claim which is registered by giving a notice is known as:

  1. Registering claims

  2. Establishing claims

  3. Presentation claims

  4. None of the above

Q8. This term covers the entire electronic and electro-mechanical equipment used in the computerized data processing system:

  1. Hardware

  2. Software

  3. Operators

  4. Procedure

Q9. This enables the electronic transfer of a complete file from one computer to another:

  1. Internet

  2. Intranets

  3. telnet

  4. File Transfer Protocol (FTP)

Q10. It is an assurance to the owner that selected the contractor will actually proceed with the contract at the bid price:

  1. performance Bonds

  2. Bid Bonds

  3. Claim Bonds

  4. Contract Bonds

Can you risk sending out a design to a supplier when the design is to be proved

Can you risk sending out a design to a supplier when the design is to be proved

Can you risk sending out a design to a supplier when the design is to be proved

Part Two:

Q1. What are the main causes of a Project Failure?

Q2. What is Responsibility assignment Matrix (RAM) chart?

Q3. Define Professional Construction Management (PCM) approach.

Q4. Differentiate between Project Management & General Management.

Q5. Should you go with a department that has been chronically delaying when the contract has a large incentive/penalty clause for on-time delivery?

Q6. Can you risk sending out a design to a supplier when the design is to be proved?

Q7. What are the significant features of HLL’s ad campaign ‘Project Bharat’?

Q8. How has HLL identified itself with India’s Economic Development?

Q9. Who is a Project Manager? Describe the Role of a Project Manager.

Q10. What is PMIS Report? Explain the benefits of establishing PMIS.

 

Our Key Services

Assignment Help

Case study help

Report Writing

Homework / Assessment help

Essay writing and editing

Project Report

Dissertation writing

Thesis writing & editing

Professional report writing

Academic writing

Coursework Writing

Research paper writing

 

Dr.ARAVIND BANAKAR 

aravind.banakar@gmail.com

https://www.mbacasestudyanswers.com

09901366442 – 09902787224

Share Button